The average of the two dates
The calculator averages the two dates and converts the result back to a calendar date. Dates are treated as date-only values, so time of day and daylight-saving changes never shift the answer.
Calculate the exact midpoint date between two calendar dates with a transparent browser-based method.
Your dates stay on this page ↘
Core form values are processed in your browser.
Review the method and limitations below.
Enter a start date and an end date, in either order. The calculator finds the calendar date exactly halfway between them and reports it together with the total elapsed days and the length of each half — useful for project timelines, anniversaries, and scheduling around a central date.
The calculator averages the two dates and converts the result back to a calendar date. Dates are treated as date-only values, so time of day and daylight-saving changes never shift the answer.
From 1 January 2026 to 20 July 2026 is exactly 200 days. Half of 200 is 100, and 100 days after 1 January is 11 April 2026 — the midpoint the calculator returns, with 100 days in each half.
When the span has an odd number of days, the true halfway moment falls at midday. For 1 March to 8 March 2026 (7 days), the calculator shows 4 March, with a 3-day first half and a 4-day second half. If both dates are the same, the midpoint is simply that date.
This tool keeps the input dates, counting convention and result together so the answer can be checked.
Enter the first date of the span, in either order — the two dates can be swapped without changing the result.
Enter the second date. Dates are treated as date-only values, so time of day and daylight-saving changes never shift the answer.
The calculator averages the two dates and converts the result back to a calendar date, reporting the total elapsed days and the length of each half alongside.
1 January to 20 July 2026 spans exactly 200 days, so the midpoint is 100 days in: 11 April 2026, with 100 days in each half. On an odd span the true halfway moment falls at midday — 1 to 8 March 2026 shows 4 March, a 3-day first half and a 4-day second half. If both dates are the same, the midpoint is that date.
A useful answer includes both the number and its assumptions.
Date Midpoint Calculator calculates the exact midpoint date between two calendar dates using Gregorian calendar arithmetic. Dates are treated as date-only values, avoiding accidental time-of-day and daylight-saving shifts.
The calculator counts the elapsed days between the two dates, halves that count, and adds the result to the start date. On an even span the halves are equal. On an odd span the count cannot be split evenly, so the whole days are divided as evenly as possible — the first half takes the smaller share — and the exact halfway moment falls at midday on the date shown. That is why the 1 to 8 March example produces halves of 3 and 4 days rather than 3.5 and 3.5. Note the counting convention: the start date is day zero and the count measures elapsed time. A plan or contract that counts both the first and the last day as full days is working with a span one day longer, and its middle day can fall one day later than the date shown here — check which convention your document uses before treating the midpoint as a deadline.
Both inputs are calendar dates, and each is treated as a whole day. Daylight-saving changes make some local days 23 or 25 hours long in clock time, but they never change how many calendar days sit between two dates, so they never move the midpoint. If an interval is genuinely defined by timestamps — a 72-hour equipment hire, a connection measured in hours — its halfway instant can sit up to half a day away from the date midpoint. For anything planned in whole days, which is what this tool is for, the date midpoint is exact.
With two dates, the midpoint and the average are the same thing. With several dates they are not. The halfway point of a range — halfway between the earliest and the latest date — usually differs from the median, the date in the middle of the list. For events on 1, 2 and 31 January, the range midpoint is 16 January while the median is 2 January. This calculator returns the range midpoint of the two dates you enter; the middle value of a longer list cannot be found by entering its first and last dates here.
Want the reasoning behind the method? Read Finding the Midpoint Between Two Dates — the step-by-step guide with worked examples, odd-span handling, and common mistakes to avoid.
Each example can be checked against the calculator: enter the same two dates and the same midpoint comes back, together with the length of each half.
A project runs from 12 January to 8 May 2026 — 116 days in total. Half of 116 is 58, so the midpoint is 11 March 2026, with 58 days before it and 58 days after it: a natural date for a mid-project review or a phase handover.
Counting 280 days from a last-period date of 1 February 2026 gives a due date of 8 November 2026. The midpoint of that span is 21 June 2026 — exactly 140 days in, the 20-week halfway mark. If dating from a scan shifts either date, the midpoint shifts with them.
A contract running from 1 April 2026 to 31 March 2027 spans 364 days. Half of 364 is 182, and 182 days after 1 April is 30 September 2026 — the exact middle of the term, and a sensible date for a mid-term review.
Answers about method, odd spans, order and boundaries.
The calculator averages the two dates: it counts the days between them, halves that number, and adds it to the start date. From 1 January to 20 July 2026 is 200 days, so the midpoint is 100 days in: 11 April 2026.
The true halfway moment falls at midday. The calculator reports a calendar date: for 1 March to 8 March 2026 (7 days) it shows 4 March, with a 3-day first half and a 4-day second half.
No. The two dates can be swapped without changing the result.
The midpoint is simply that date.
No. Dates are treated as date-only values, so time of day and daylight-saving changes never shift the answer.
Use a neighboring method when the question changes.